What we make
Seven job types, with an indicative rate, what the rate includes, the size we will not exceed, and the lead time. Rates are indicative because every job differs — what moves them is listed below.
01 / 07
Aluminium windows and doors
Sliding and swing windows, sliding doors, fixed panels, insect screens.
6063-T5 extrusion, powder-coated. 5 mm clear, tinted or laminated glass.
฿2,800 – ฿4,600/ m²
excl. VAT 7%฿3,600 – ฿5,800/ m²
excl. VAT 7%10 working days
What that includes
- Frame, glass, hardware and seals
- Fitting and silicone
- Removing the old unit
What it does not
- Repairing the wall opening
- Painting the reveal
- Curtains or blinds
The limit
Single panel up to 1,800 × 2,400 mm. Above that it needs a heavier system we do not stock, and we will say so rather than build it anyway.

02 / 07
Stainless doors and gates
Security doors, folding gates, sliding driveway gates, shopfront grilles.
SS304 only for anything outdoors. Ask us why — the answer is on the materials page.
฿9,500 – ฿19,000each
excl. VAT 7%฿6,800 – ฿9,500/ linear metre
excl. VAT 7%12 – 15 working days
What that includes
- Frame, infill, hinges or track
- Lock preparation
- Fitting
What it does not
- The lock cylinder itself
- Electric operators
- Concrete work for a track
The limit
Sliding gates to a 6 m clear opening. Beyond that it is a cantilever system and a different trade.

03 / 07
Steel fencing
Mild steel posts and rails, vertical bar or mesh infill.
At 1.8 m high, hot-dip galvanised then powder-coated.
฿1,900 – ฿3,200/ linear metre
excl. VAT 7%7 – 10 working days for runs up to 20 m; longer runs are quoted with a date
What that includes
- Posts, rails and infill
- Gate hardware where a gate is in the run
- Setting posts in concrete
- Galvanising and finish
What it does not
- Removing the old fence
- Levelling the ground
- Retaining walls
The limit
No boundary walls, and nothing a licensed engineer has to stamp.

04 / 07
Handrails and balustrades
Stair rails, balcony rails, ramp rails, pool-side rails.
SS304 38 mm round or square, or powder-coated mild steel indoors.
฿2,400 – ฿3,800/ linear metre
excl. VAT 7%฿1,500 – ฿2,300/ linear metre
excl. VAT 7%10 working days
What that includes
- Posts, rail and infill
- Fixing to the structure
- Finish
What it does not
- Core-drilling into post-tensioned slabs — we will not, and we will explain why
The limit
We build to a 1.10 m rail height and a 100 mm maximum gap as standard, and we will not build lower or wider even if you ask.

05 / 07
Awnings and canopies
Shopfront awnings, carport roofs, walkway covers, machine covers.
Steel or aluminium frame, metal sheet or polycarbonate.
฿1,500 – ฿2,400/ m²
excl. VAT 7%7 working days
What that includes
- Frame, sheet and flashing
- Fixing to the building
- A gutter where the span needs one
What it does not
- Downpipes into an existing drain
- Roof waterproofing
- Electrical work
The limit
Clear span to 4.5 m without an intermediate post.

06 / 07
Industrial platforms and stairs
Access platforms, mezzanine floors, machine stairs, walkways, guarding.
Chequer plate or grating deck, with stair, handrail and kick plate.
฿4,800 – ฿7,500/ m²
excl. VAT 7%3 – 4 weeks, quoted with a date rather than a range once the drawing is agreed
What that includes
- Structure and deck
- Stair, handrail and kick plate
- Finish
What it does not
- Any structural calculation requiring a licensed engineer’s stamp. We build to a drawing that already has one, or to a load we can state and stand behind.
The limit
Single level only, deck height to 3.5 m.

07 / 07
Small-batch parts and repairs
Brackets, frames, jigs, guards, trolleys, replacement parts, machine repair.
Quantities from 1 to about 200. Beyond that we will tell you to find a press shop.
฿480/ hour, plus material
excl. VAT 7%฿1,500
3 – 5 working days, often faster for a repair that has stopped a machine
What that includes
- Cutting, forming, welding and deburring
- Tolerance ±0.5 mm on cut and drilled work
- Tolerance ±1 mm on welded assemblies
What it does not
- Anything tighter than ±0.5 mm — that goes to the small mill and lathe and is quoted separately
The limit
Bring a drawing, a sample, a photo of the broken one, or a sketch. All four are fine.

What moves a quote
None of this is a surprise charge. It is on the quote before you agree to anything.
| Site access — no vehicle access, stairs, a narrow soi | + 5 – 15% |
|---|---|
| Working above 2 m — scaffold or a lift | + 10 – 20% |
| An existing opening that is not square or not plumb | + ฿800 – ฿2,500 per opening |
| Work after 18:00 or on Sunday, in a business still trading | + 25% |
| A site more than 40 km from Ban Chang | + ฿12 / km both ways, stated on the quote |
| Removing and disposing of the old item | + ฿500 – ฿1,800 |
| Hot-dip galvanising | + 5 working days, sent out, not done in-house |
| A colour outside the standard powder range | + ฿1,200 and + 3 working days |
What we do not do
- Structural steel for buildings requiring a licensed engineer’s stamp. We will tell you who to call.
- High-rise work, curtain walling, anything over three storeys.
- Jobs where we would be a sub-sub-contractor on a large site. We cannot chase payment through three companies, so we do not start.
- Hot-dip galvanising in-house — it is sent out, and it adds 5 days.
- Anodising — also sent out.
- CNC machining beyond small parts. There is a small mill and a lathe here, not a machining centre.
- Same-day work, except a broken security gate or door on a building that has to open.
- Any design we think is unsafe. At any price.